[E4] Tohoku Expressway In-bound) Morioka Minami IC
Notice of nighttime closure of entrance ramp

October 21st (Monday) to 24th (Thursday) from 8pm to 6am each day
~ Repairing the pavement ~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4] Notice of nighttime closure of entrance ramp for Morioka Minami IC on Tohoku Expressway (In-bound)

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 666KB]

September 20 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Morioka Management Office

At NEXCO EAST Morioka Management Office (Morioka City, Iwate Prefecture), E4 A night-time closure will be implemented at the entrance ramp to In-bound lanes of Morioka Minami Interchange (hereinafter referred to as "IC") on Tohoku Expressway (hereinafter referred to as "Tohoku Expressway") to repair damaged pavement.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Closed location and date and time

  1. Closing point:
    Tohoku Expressway In-bound Line: Morioka Minami IC Entrance ramp (for Sendai)
  2. Image of closed area
    • Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    October 21st (Monday) to October 24th (Thursday) 2024
    Every day from 20:00 to 6:00 the next morning
    Preparation day:
    October 25th (Friday), 28th (Monday) to 30th (Wednesday) 2024
    Every day from 20:00 to 6:00 the next morning
Image of date and time

Usage Guide

Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to the attached document [PDF: 98KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Construction overview

Tohoku Expressway In-bound Repair work will be performed on the entrance ramp at the Morioka-Minami Interchange due to pavement damage. The section where this work will be performed is a single lane, and since it is not possible to perform the work with normal lane restrictions, it will be necessary to close the ramp for the work.
Therefore, in order to minimize inconvenience to customers, the ramp will be closed during the nighttime on weekdays when traffic volume is low, so that the work can be carried out in an intensive and efficient manner. We ask for your understanding and cooperation as this work is necessary for the safe and comfortable use of Expressway.

photo of pavement damage photo
Pavement damage pictures
Image of the pavement after repairs are completed
Image of the pavement after repairs are completed

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed through the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.