[E13] Tohoku-Chuo Expressway Yonezawa Kita IC - Nanyo Takahata IC
Notice of night traffic closure

October 21st (Monday) to November 1st (Friday) 8pm to 6am
~ Pavement repair work will be carried out ~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E13] Tohoku-Chuo Expressway Up and Down Line Yonezawa Kita IC - Nanyo Takahata IC Notice of nighttime traffic closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 520KB]

September 20 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Yamagata Management Office

NEXCO EAST The Yamagata Management Office (Yamagata City, Yamagata Prefecture) will close the road for the night due to pavement repair work at the Yonezawa Kita Interchange (hereinafter referred to as "IC") to Nanyo Takahata IC on the E13 Tohoku-Chuo Expressway (hereinafter referred to as "Tohoku Chuo Road") up and down route.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation in allowing extra time for your trip.

1. Closed section and date and time

  1. Closed section:
    Tohoku Chuo Expressway, both inbound and outbound lanes, Yonezawa Kita IC to Nanyo Takahata IC
  2. Image image of closed section
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • The signs such as E13 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and Time
    Tohoku Chuo Expressway, both inbound and outbound lanes, Yonezawa Kita IC to Nanyo Takahata IC
    Implementation date:
    October 21st (Monday) to November 1st (Friday) 2024
    Every day from 20:00 to 6:00 the next morning
    Preparation day:
    November 5th (Tuesday) to November 11th (Monday) 2024
    Every day from 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to the attached document [PDF: 175KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Construction overview

Pavement repair work will be carried out on the Tohoku Chuo Highway between the Yonezawa Kita IC and the Nanyo-Takabatake IC on both the upper and lower lines due to damage to the road surface. In order to minimize inconvenience to customers, the road will be closed during weekday evenings when traffic volume is low, and the work will be carried out in an intensive and efficient manner. We ask for your understanding and cooperation as this work is necessary for the safe and comfortable use of Expressway.

photo of pavement damage photo
Pavement damage pictures
Image after pavement repair
Image after pavement repair

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed through the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.