[E4] Notice of closure of Maemoriyama PA (both inbound and outbound lanes) Tohoku Expressway
In-bound: June 24th (Mon) - August 6th (Tue), Out-bound: September 2nd (Mon) - October 18th (Fri)
~Barrier-free construction work will be carried out~
- Corporate Top
- Press Room
- Press Release Tohoku office
- [E4] Notice of closure of Maemoriyama PA (both inbound and outbound lanes) Tohoku Expressway
The latest regulatory information isDraTraPlease see.
May 24 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Morioka Management Office
NEXCO EAST Morioka Management Office (Morioka City, Iwate Prefecture) will close the E4 Tohoku Expressway (hereinafter referred to as "Tohoku Expressway") up and down line Maemoriyama Parking Area (hereinafter referred to as "PA") all day due to the construction of barrier-free access at the ramp.
We apologize for any inconvenience this may cause, and ask for your understanding and cooperation in using the nearby rest facilities shown in the attached [PDF: 240KB].
1. 1. Closing location and date and time
- Closure
[1] Maemoriyama PA on Tohoku Expressway Expressway In-bound)
[2] Maemoriyama PA on Tohoku Expressway Expressway Out-bound) - Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
- Date and time
- [1] Maemoriyama PA on Tohoku Expressway Expressway In-bound)
- [2] Maemoriyama PA on Tohoku Expressway Expressway Out-bound)
Implementation date:2024, 5:00PMImplementation date:2024 Monday, September 2, 9:00 a.m. to Friday, October 18, 5:00 p.m.
Usage Guide
- In stormy weather, it will be postponed to the spare day.
- The decision to proceed with construction will be announced on the same day via X (formerly Twitter), etc.
2. Rest facilities available during closure
For information on available rest facilities during closure, please refer to the attached document [PDF: 240KB].
Due to the closures, travel times between rest facilities will be longer, so please allow plenty of time when traveling.
3. Construction overview
Maemoriyama PA on both northbound and southbound lanes of Tohoku Expressway will be raising the pavement as part of barrier-free construction work. This work cannot be carried out due to parking restrictions, so the PA must be closed to carry out the work. Therefore, in order to minimize inconvenience to customers, the work will be carried out in a concentrated and efficient manner.
This construction is necessary to ensure safe and comfortable use of Expressway, so we ask for your understanding and cooperation.
Four. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs and leaflets will be posted at nearby rest facilities.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time informationConstruction regulation information
- 日本道路交通情報センター(JARTIC)道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
岩手情報 050-3369-6603
東北地方高速情報 050-3369-6761
【アドレス】https://www.jartic.or.jp/ - LINE official account "NEXCO EAST"We inform you about the traffic closure situation in NEXCO EAST jurisdiction.
[Search] Search by "NEXCO EAST"
[ID] @e-nexco
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed through the official X (formerly Twitter) account.
"NEXCO EAST (Tohoku)" (@e_nexco_tohoku) Traffic information
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.