[E7] Notice of night closure of Akita Expressway Akita Minami IC (B/D ramp)
October 30th (Monday), November 13th (Monday)
- Corporate Top
- Press Room
- Press Release Tohoku office
- [E7] Notice of night closure of Akita Expressway Akita Minami IC (B/D ramp)
The latest regulatory information isDraTraPlease see.
October 5, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office
NEXCO EAST Akita Management Office (Akita City, Akita Prefecture) is located at E7 Akita Expressway (hereinafter referred to as "Akita Road") Akita Minami Interchange (hereinafter referred to as "IC") We will be closed at night to replace the sign board at the exit ramp.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation so that you can have plenty of time when you go out.
1. Regulation section and date and time
- Restricted sectionNighttime closure regulations:[1] Akita Expressway In-bound Line Ramp from Noshiro direction Out-bound Akita Minami IC[2] Akita Expressway Out-bound Line Out-bound from Yokote direction to Akita Minami IC
- Indications such as E7 attached to the route indicate the route number (numbering) of Expressway, etc.
- date and time
Night lamp closure regulationImplementation date【1】秋田道 秋田南IC Bランプ
(能代方面から秋田南ICへ下りるランプ)令和5年10月30日(月)
夜21時~翌朝6時【2】秋田道 秋田南IC Dランプ
(横手方面から秋田南ICへ下りるランプ)令和5年11月13日(月)
夜21時~翌朝6時Preparation dayOctober 31st (Tuesday), November 1st (Wednesday), November 14th (Tuesday), November 15th (Wednesday), 2020Every day from 21:00 to 6:00 the next morning
- In stormy weather, it will be postponed to the spare day.
- The decision to proceed with construction will be announced on X (formerly Twitter), etc.
2. Detour
For detours, please refer to [Attachment 1] [PDF: 216KB] and [Attachment 2] [PDF: 186KB].
The detour will increase the travel time, so please allow plenty of time for your trip.
3. Construction overview
Akita Road Since the deterioration of the sign board is progressing at the exit ramp of the Akita Minami IC, we will carry out sign board replacement work. The section where this work is carried out is one lane, and it is necessary to close the ramp and work because the construction cannot be carried out with normal traffic regulations inside the ramp.
Therefore, in order to cause as little inconvenience to customers as possible, we will close the lamps on weeknights when there is little traffic and carry out construction intensively and efficiently. This construction is necessary for safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.
Four. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time informationConstruction regulation information
- 日本道路交通情報センター(JARTIC)道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
東北地方高速情報 050-3369-6761
秋田情報 050-3369-6605
【アドレス】https://www.jartic.or.jp/ - LINE official account "NEXCO EAST"We inform you about the traffic closure situation in NEXCO EAST jurisdiction.
[Search] Search by "NEXCO EAST"
[ID] @e-nexco
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed on the official X (formerly Twitter) account.
"NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.