[E4] Tohoku Expressway In-bound Line Tayama PA Night Closure Notice

From October 16th (Monday) to October 18th (Wednesday) from 8:00 PM to 6:00 AM the next morning
~We will carry out pavement repair work to make it barrier-free~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4] Tohoku Expressway In-bound Line Tayama PA Night Closure Notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 368KB]

September 15, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Aomori Management Office

NEXCO EAST Aomori Management Office (Aomori City, Aomori Prefecture) will carry out pavement repair work to make the E4 Tohoku Expressway (hereinafter referred to as `` Tohoku Expressway'') In-bound line Tayama Parking Area (hereinafter referred to as ``PA'') ramp barrier-free. Therefore, we will be closed overnight.
We apologize for any inconvenience this may cause to our customers, but we ask for your understanding and cooperation so that you have plenty of time to spare when you go out.

1. Closed location and date and time

  1. Closed location:
    Tohoku Expressway In-bound Line Tayama PA
  2. Image of closed area
    • Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    October 16th (Monday) to October 18th (Wednesday), 2020
    Every day from 20:00 to 6:00 the next morning
    Preparation day:
    October 19th (Thursday), 20th (Friday), 23rd (Monday), 2020
    Every day from 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on the same day via X (formerly Twitter), etc.

2. Construction overview

Pavement repair work will be carried out at Tayama PA on Tohoku Expressway In-bound Line to make it barrier-free. The section where this work will be carried out has one lane, and since it is not possible to carry out the work under normal lane regulations, it is necessary to close the PA and carry out the work.
Therefore, in order to minimize the inconvenience to our customers, we will close the PA on weekday nights when traffic is light and carry out the construction work intensively and efficiently. This work is necessary to ensure safe and comfortable use Expressway, so we ask for your understanding and cooperation.

Photo of Tayama PA situation
Tayama PA status
Pavement repair work work status photo
Pavement repair work status

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs and leaflets will be posted at nearby rest facilities.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)

Attachment

Tohoku Expressway Tayama PA location map [PDF: 123KB]

Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.