[E4] Tohoku Expressway (between Shiwa IC and Morioka Minami IC)
Implementation of nighttime closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4] Implementation of nighttime closure on the Tohoku Expressway (between Shiwa IC and Morioka Minami IC)

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 533KB]

October 11, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Morioka management office

NEXCO EAST Morioka Management Office (Morioka City, Iwate Prefecture) has announced the following for the variable road information board facility renewal work between the E4 Tohoku Expressway Shiwa Interchange (IC) and Morioka Minami IC. We will close the road at night as shown below.
Therefore, when you go out, please leave with plenty of time, and when you drive, please make a detour to Route 4.
We apologize for any inconvenience caused to customers using the Expressway, but we ask for your understanding and cooperation in the construction work necessary to use the Expressway safely and comfortably.

1. Closed section

Between Shiwa IC and Morioka Minami IC on the Tohoku Expressway (upper and lower lines)
Attachment-1 [PDF: 217KB]

(Location map)

Image of (position map)
Geographical Survey Institute (GSI) ( https://maps.gsi.go.jp/ ), East Japan Expressway Co., Ltd.

2. Closed date and time

Between Shiwa IC and Morioka Minami IC (upper and lower lines)
Friday, November 12, 3rd year of Reiwa from 0:00 to 5:00
[Preliminary day: Saturday, November 13th and Tuesday, November 16th, every night from 0:00 to 5:00]

  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

3. Detour

Prefectural Route 46, National Route 4, National Route 46 (Attachment-1 [PDF: 217KB])

Four. Construction content

Variable road information board equipment update

We will carry out renewal work due to the deterioration of the information board.

Image image before construction
Before construction
Photo after construction (image)
After construction (image)
  • We will close the road to remove the variable road information board and pillars in the red frame.

Five. Regarding transit fare adjustment due to suspension of traffic

Attachment-2 [PDF: 139KB]

For passengers who leave the Expressway once due to a nighttime suspension and bypass the closed section and transfer again in the same direction, we will make a "transit adjustment" to adjust the toll according to the section used.

6. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    岩手情報 050-3369-6603
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.