【E4A】 Hachinohe Expressway (between Hachinohe JCT and Hachinohe Kita IC)
[E4A] Hachinohe Expressway (between Hachinohe JCT → Hachinohe JCT toll booth)
【E4A】 Momoishi Toll Road (Hachinohe Kita IC - Shimoda Momoishi IC)
Implementation of traffic closure at night
- Corporate Top
- Press Room
- Press Release Tohoku office
- 【E4A】 Hachinohe Expressway (between Hachinohe JCT and Hachinohe Kita IC) 【E4A】 Hachinohe Expressway (Hachinohe JCT → Hachinohe JCT toll gate)[E4A] Momoishi Toll Road (Hachinohe Kita IC to Shimoda Momoishi IC) Nighttime Implementation of road closure
The latest regulatory information isDraTraPlease see.
September 27, 2019
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Hachinohe Management Office
NEXCO EAST Hachinohe Management Office (Hachinohe City, Aomori Prefecture) is E4A Hachinohe Expressway Hachinohe Junction (JCT) -Hachinohe Kita Interchange (IC) (upper and lower lines) and Hachinohe JCT-Hachinohe JCT toll office (Out-bound line), E4A Momoishi Toll Road Hachinohe Kita IC and Shimoda Hyakuseki IC (upper and lower lines), we will close the road at night due to pavement repair work.
This work is necessary to maintain a safe and comfortable environment on the Expressway We will do our best to minimize the inconvenience to our customers, so we ask for your understanding and cooperation.
1 closed section
- [1] Hachinohe Expressway
- Between Hachinohe JCT and Hachinohe North IC (upper and lower lines)
- [2] Hachinohe Expressway
- Between Hachinohe JCT and Hachinohe JCT tollgate (Out-bound line)
- [3] Momoishi Toll Road
- Between Hachinohe Kita IC and Shimoda Hyakuseki IC (upper and lower lines)
2 suspension period
[1] [2] [3] Night Closure 2019 5 nights from October 28 (Mon) to November 1 (Fri)
[Preliminary Date: 2019, November 5 (Tuesday) to 8 days (gold), November 11 (Mon) to 15 (Friday)]
[Attachment-2] [PDF: 136KB]
3 closed hours
Every night from 20:00 to 6am
4 Detour
5 Construction content
We will carry out pavement repair work, sign improvement work associated with numbering measures, and night traffic closures associated with traffic safety facility work.
Pavement repair work
We will repair the damaged pavement surface.
6 Regarding transfer fare adjustment due to suspension of traffic
Passengers who flow out of the Expressway due to suspension of traffic, bypass the suspension of traffic, and then transfer again in the same direction, will make "transit adjustment" to adjust the toll according to the segment used. Please refer to the attached document for the details of transit adjustment.
7 Information provision
The decision on whether or not to close at night will be made at 16:30 in the evening on the day of the implementation.
Information such as road traffic information
- DraPla", a site full of useful information on Expressway nationwide
【address】
PC version
Mobile version (http://m.driveplaza.com/)
Smartphone version (http://www.driveplaza.com/smp/) - Expressway traffic information service "Drive Traffic (DraTra)"
NEXCO EAST Homepage "Construction Regulation Information" (Provides information on construction regulations in each region)
Please see "North Tohoku" for Aomori, Akita, and Iwate prefectures, and "South Tohoku" for Miyagi, Yamagata, and Fukushima prefectures.
It provides real-time road traffic information and traffic jam forecasts.
【address】
PC version
Mobile version (http://m.drivetraffic.jp/)
Smartphone version (http://www.drivetraffic.jp/smp/) - NEXCO東日本お客さまセンター
24時間365日オペレーターが応対いたします。
【電話番号】
0570-024-024 または 03-5338-7524 - ハイウェイテレホン
電話でリアルタイムの交通情報(5分更新)を24時間入手できます。
【電話番号】
青森局 017-781-1620
(公財)日本道路交通情報センター
050-3369-6602(青森情報)
050-3369-6761(東北地方高速情報) - Highway radio
Highway radio (AM1620kHz)
The section that is broadcasting is indicated by the sign on Expressway.
Wide-ranging road information is provided in an easy-to-understand manner on monitor screens installed in SA / PA.
* Twitter's official account "NEXCO EAST (Tohoku)" (@e_nexco_tohoku ) Also delivers information.
8 Efforts to minimize inconvenience to customers due to construction work
(1) Strengthening information provision
In addition to the information board (lightning bulletin board) on the Expressway will be closed Hachinohe Expressway (Johoji IC-Hachinohe IC, Hachinohe JCT-Hachinohe Kita IC) and Momoishi Toll Road (Hachinohe Kita IC-Shimoda Hyakuseki IC). We will prepare posters and leaflets at each tollhouse and standing signs and leaflets at rest facilities and notify you in advance.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.