Sendai-Hokubu Road Traffic situation after completion of "Rifu JCT full" (preliminary report) and maintenance effect after half a year of Sendai-Hokubu Road "Rifu Shirakashidai IC-Tomiya JCT"
- Corporate Top
- Press Room
- Press Release Tohoku office
- Sendai-Hokubu Road Traffic situation after completion of "Rifu JCT full" (preliminary report) and maintenance effect after half a year of Sendai-Hokubu Road "Rifu Shirakashidai IC-Tomiya JCT"
November 19, 2010
Sendai River National Highway Office, Tohoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism
East Japan Expressway Tohoku Regional Head Office Sendai Construction Office
About the traffic situation (preliminary report) of "Rifu JCT full conversion" completed on October 22, 2010 and the maintenance effect after half a year of "Rifu Shirahashidai IC-Tomiya JCT" opened on March 27, 2010, We will inform you as follows.
1. [Traffic situation (preliminary report) after the completion of Rifu JCT full-scale]
(1) The traffic volume of Rifu JCT (Sen Taipei Sendai-Hokubu Road-Sanriku Road/Matsushima) is 1,800 vehicles/day
- Sendai-Hokubu Road, traffic volume using Sanriku Road is increasing. (Material-1) [PDF: 51KB]
2. [About the effect of maintenance between Rifu Shirakashidai IC and Tomiya JCT after 6 months]
(2) The traffic volume of Sendai-Hokubu Road is increasing due to the formation of Sendai Metropolitan Expressway Ring Road (Gurutto and Sendai).
- The traffic volume on the Sendai-Hokubu Road (Rifu JCT-Rifu Shirakashidai IC) 7,900 units / day And six months after opening 126% increase doing. (Document-2) [PDF: 71KB]
(3) Congestion of surrounding roads has eased
- The traffic volume on the (main) Shiogama Yoshioka Line, which runs parallel to the Sendai-Hokubu Road, 1,800 units/day Decreased and running speed 9km / h improvement doing. (Document-3) [PDF: 59KB]
(4) Logistics efficiency is improved by shortening transportation time
- Sendai-Hokubu Road About 80% Reduces time and transportation costs Reduction effect I answered that there is. (Document-4) [PDF: 97KB]
(5) Supports rapid blood transport
- The number of blood transports using Sendai-Hokubu Road 11 cases / month → 28 cases / month (2.5 times) increase doing. (Document-5) [PDF:74KB]
(6) The range of activities in daily life is Large
- Residents along the Sendai-Hokubu Road (Izumi-ku, Sendai City, Taiwa Town, Tomiya Town) Action range Up to the Sendai-Tobu Road Large doing. (Document-6) [PDF:55KB]
- "Gurutto and Sendai": A nickname for the Sendai metropolitan high-speed ring network
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.