[E7] Nihonkai-Tohoku Expressway (Niigata Airport IC-Arakawa Tonai IC)
Notice of night traffic closure due to pavement repair work etc.

  • Corporate Top
  • Press Room
  • Press Release Niigata office
  • [E7] Nihonkai-Tohoku Expressway (Niigata Airport IC-Arakawa Tonai IC) Notice of night closure due to pavement repair work etc.

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 784KB】

August 25, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Niigata Regional Head Office

NEXCO EAST Niigata Regional Head Office (Niigata Chuo-ku) is, E7 Nihonkai-Tohoku Expressway in Niigata Airport Niigata Airport Interchange (IC) ~ Arakawa womb Arakawa body IC (top and bottom lines), associated with such as pavement repair work face-to-face-way section , We will close the road at night.
When you go out, please leave with plenty of time, and when you drive, please detour to National Highway No. 7 (Shinshin Bypass) or National Highway No. 7.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation as it is a road closure necessary for the safe and comfortable use of Expressway

Route Nihonkai-Tohoku Expressway up and down line
section (1) Niigata Airport IC-Seiro Shibata IC (2) Seiro Shibata IC-Arakawa wombai IC
Implementation period September 27th (Monday) -October 1st (Friday) [5 nights]
Preliminary day: October 4th (Monday) to 8th (Friday)
October 11th (Monday) to 15th (Friday) [5 nights]
Preliminary day: October 18th (Monday) to 22nd (Friday)
Time From 20:00 to 6:00 the next day
* Not available on Saturdays, Sundays, and nights. (Friday night construction is until 6 am on Saturday)
Regulation content Night traffic
Construction content Pavement repair work and maintenance repair work, etc.
Remarks
  • During the closed period of (1), the Toyosaka Service Area (SA) and Toyosaka Smart IC (both up and down lines) will not be available from 20:00 to 6:00 the next morning.
  • Depending on the weather and construction progress, the regulation section / period / time may be changed or canceled.
  • When using, please check the latest information from Attachment-1 [PDF: 61KB], such as services that provide road traffic information of NEXCO EAST

Closing position map and detour map

  • (1) Niigata Airport IC-Seiro Shibata IC (upper and lower lines)
    • [Closed date and time]
    • (1) September 27th (Monday) -October 1st (Friday)
      [5 night]
    • 20:00 to 6:00 the next morning
      • Not held on Saturdays, Sundays and nights
        (Friday night construction until 6 o'clock on Saturday)
    • 【Preparation day】
    • (1) October 4th (Monday) to 8th (Friday)
    • 20:00 to 6:00 the next morning
  • Toyosaka SA and Toyosaka Smart IC (both up and down lines) cannot be used from 20:00 to 6:00 the next morning.
  • (2) Seiro Shintada IC-Arakawa-Taina IC (upper and lower lines)
    • [Closed date and time]
    • (2) October 11th (Monday) to 15th (Friday)
      [5 night]
    • 20:00 to 6:00 the next morning
      • Not held on Saturdays, Sundays and nights
        (Friday night construction until 6 o'clock on Saturday)
    • 【Preparation day】
    • (2) October 18th (Monday) to 22nd (Friday)
    • 20:00 to 6:00 the next morning
Image of road closure map

About detour

It takes about 15 minutes from Niigata Airport IC to Seiro Shibata IC, but it takes about 20 minutes under normal traffic conditions when using National Highway No. 7 (Shinshin Bypass).
It takes about 20 minutes from Seiro Shin-Taina IC to Arakawa-Taina IC, but it takes about 45 minutes under normal traffic conditions when using National Highway No. 7.

  • (1) Please refer to Attachment-2 [PDF: 86KB] for the adjustment of the transfer fare due to the closure of the closed section (Niigata Airport IC-Seiro Shibata IC).
  • (2) There is no transfer charge adjustment due to the suspension of the closed sections (Seigo Shibata IC-Arakawa Tonai IC).

Closing period

Image of the road closure period

Construction overview

We will repair damaged road surfaces from Niigata Airport IC on the Nihonkai-Tohoku Expressway

Photograph of damaged road surface
Damaged road surface condition
Photograph of installation image of wire rope
Installation image of wire rope
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.