[C3] Gaikan Expressway Kawaguchi Nishi IC, Kawaguchi JCT, Toda Nishi IC
Nighttime ramp closure notice

~ Repair work will be carried out on damaged expansion joints and pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C3] Notice of nighttime ramp closures at Kawaguchi Nishi IC, Kawaguchi JCT, and Toda Nishi IC Gaikan Expressway

The latest regulatory information is​ ​DraTra​ ​Please see.

PDF version [PDF: 938KB]

February 3, 2025
East Nippon Expressway Co., Ltd.
Misato Management Office

NEXCO EAST Misato Management Office (Misato City, Saitama Prefecture) will be closing ramps at interchanges (hereinafter referred to as "ICs") and junctions (hereinafter referred to as "JCTs") on the C3 Gaikan Expressway (hereinafter referred to as the "Outer Ring Expressway") to carry out expansion joint replacement work and pavement repair work.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Lamp closure location and date and time

number Road name Closed point period Attachment
C3 Outer ring road Kawaguchi Nishi IC
(Inner loop entrance ramp)
Monday, February 17
8pm to 5am the next morning
Document-1 [PDF: 274KB]
Kawaguchi JCT
(Outer loop → Metropolitan Expressway Kawaguchi Line In-bound Ramp)
February 18 (Tuesday)
8pm to 5am the next morning
Document-2 [PDF: 258KB]
Kawaguchi JCT
(Inner loop → Shuto Expressway Kawaguchi Line In-bound Ramp)
Wednesday, February 19
8pm to 5am the next morning
Document-3 [PDF: 257KB]
川口JCT
(内回り・外回り→首都高速川口線 上り方面ランプ)
Thursday, February 20
8pm to 5am the next morning
Document-4 [PDF: 260KB]
Toda Nishi IC
(Outer exit ramp)
February 25th (Tue) - 27th (Thu)
Every night from 9pm to 5am the next morning
Document-5 [PDF: 275KB]
  • The C3 designation on each route indicates the route number (numbering) of Expressway, etc.
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In the event of bad weather, the event will be postponed to the backup day.
    Please refer to the attached document [PDF: 698KB] for information on backup dates and detours in case of postponement.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Construction overview

Due to damage to the expansion joints and road surfaces at the ramps of each interchange and junction on the Outer Ring Road, we will be replacing the expansion joints and repairing the pavement.
Since construction work cannot be carried out under normal lane restrictions, it is necessary to close the ramps to carry out the work. Therefore, in order to minimize inconvenience to customers, we will close the ramps at night on weekdays when traffic volume is low, and carry out the work in a concentrated and efficient manner. This work is necessary to ensure that customers can use Expressway safely and comfortably, so we ask for your understanding and cooperation.

Telescopic device replacement work Photograph of work situationExtension device replacement work Caption image of work status
Photograph of damage situation of expansion deviceAn image of the caption of the damage situation of the expansion device
Pavement repair work work status photoImage of caption of work status for pavement repair work
Road surface damage photoCaption image of the road damage situation

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Judgment on implementation of construction regulations
    [LINE]
    “NEXCO EAST” (@e-nexco) Weather information and road closures
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

日本語
English
简体中文
繁體中文
ภาษาไทย
한국어