[C3] Gaikan Expressway Outer Loop Wako Kita IC Exit Ramp
Nighttime closure notice
June 10th (Mon) to 17th (Mon) from 9pm to 5am each day
~ Repair work on damaged pavement ~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [C3] Notice of nighttime closure of the exit ramp at Wako Kita IC on Gaikan Expressway
The latest regulatory information isDraTraPlease see.
May 27 2024
East Nippon Expressway Co., Ltd.
Misato Management Office
NEXCO EAST Misato Management Office (Misato Prefecture) will be closing the exit ramp at Wako Kita Interchange (hereinafter referred to as "IC") on the outer loop of the C3 Gaikan Expressway (hereinafter referred to as "Outer Ring Expressway") at night to carry out pavement repair work.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.
1. 1. Closing location and date and time
- Closures:
Outer Ring Road, Outer Loop, Wako Kita IC, Exit Ramp to Kawaguchi
(At the same time, the Shinkura Parking Area (hereinafter referred to as "PA") will also be unavailable.) - Attached to each line C3 The indications such as indicate the route number (numbering) of Expressway.
- Date and timeImplementation date:June 10th (Monday) to June 17th (Monday) 20249pm to 5am each day *Excluding weekendsPreparation day:June 18th (Tuesday) to June 27th (Thursday) 20249pm to 5am each day *Excluding weekends
- PAs within closed sections cannot be used as follows:
Outer Ring Road, Shinkura PA, 9pm to 5am - In stormy weather, it will be postponed to the spare day.
- The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.
2. Detour
Please refer to the diagram below for detours.
As indicated by
the blue arrow, exit the Outer Ring Road at Wako IC, take the main local road Wako Interchange, and use National Route 254. If you take the detour between the Outer Ring Road Wako IC and Wako Kita IC as shown in the diagram below, it is expected to take about 10 minutes (usually about 2 minutes).
3. Construction overview
Due to damage to the road surface at the exit ramp of Wako Kita IC on the outer ring road, pavement repair work will be carried out. The section in which this work will be carried out is a ramp section, and since it cannot be carried out under normal ramp regulations, it is necessary to close the ramp to carry out the work.
Therefore, in order to minimize inconvenience to our customers, we will close the ramps at night on weekdays when traffic volume is low, and carry out the work in a concentrated and efficient manner. This work is necessary to ensure that customers can use Expressway safely and comfortably, so we ask for your understanding and cooperation.
Four. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time information[Mobile] http://m.drivetraffic.jp/Construction regulation information
- 日本道路交通情報センター(JARTIC)道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
埼玉情報 050-3369-6611
【PC】https://www.jartic.or.jp/
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed on official X (formerly Twitter) and LINE accounts.
[X (old Twitter)]
"NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
“NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
[LINE]
"NEXCO EAST" (@e-nexco) Road closures and weather information
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.