[C3] Gaikan Expressway Misato JCT Nighttime ramp closure notice

June 14th (Monday) from 21:00 pm to 4:00 am the next morning
-We will replace the sign board-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C3] Gaikan Expressway Misato JCT Nighttime ramp closure notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 2.6MB]

May 31, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Taniwahara Management Office

NEXCO EAST Expressway Company (Tsukubamirai City, Ibaraki Prefecture), C3 Gaikan Expressway (hereinafter referred to as "Outer Ring Road") Misato Junction (hereinafter referred to as "JCT") lamps are used to replace sign boards and lighting columns. We will close the lamps at night for removal work and pavement repair work.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. 1. Closing location and date and time

(1) Closed place
Ramps flowing from National Highway No. 298 to the Joban Expressway Out-bound line (toward Mito) and the Metropolitan Expressway Misato Line (toward Ginza)
Image of closed area

  • Attached to each line C3 The indications such as indicate the route number (numbering) of Expressway.

(2) Date and time

Implementation date:
June 14, 3rd year of Reiwa (Monday)
From 21:00 pm to 4:00 the next morning
Preparation day:
June 15th (Tuesday) and 16th (Wednesday), 3rd year of Reiwa
Every day from 21:00 pm to 4:00 the next morning
Image of closing date
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the attached sheet [PDF: 2.5MB] for the detour.
The detour will take longer, so please leave plenty of time.

3. Construction overview

Misato JCT on the outer ring road, we will carry out sign board replacement work to number the sign boards.
In addition, we will also carry out work to remove unnecessary lighting columns and repair damaged pavement. The section where this work is to be carried out is one lane, and it is not possible to carry out the work under normal lane regulations, so it is necessary to close the lamp and carry out the work.
Therefore, in order to avoid inconvenience to customers as much as possible, we will close the lamps on weekday nights when traffic is light and carry out construction intensively and efficiently. Expressway safely and comfortably, so we ask for your understanding and cooperation.

Image of current status
Image of sign board after replacement

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at rest facilities around the area.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.