[E83] Yokohama-Shindo Road Notice of new Hodogaya IC night closure

From Monday, July 6th to Wednesday, August 5th, Monday-Thursday, from 20pm each day to 5am the next morning
~ Bridge repair work ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Yokohama-Shindo Road Notice of new Hodogaya IC night closure

E83 Due to stormy weather, the construction of the Yokohama-Shindo Road (Out-bound line) Shin-Hodogaya IC at night will be postponed to the construction day due to the effects of stormy weather.
As of Monday, July 27th, we plan to close at night with the following schedule.

  • July 28th (Tue)-August 6th (Thursday) 20pm to 5am each day (excluding Fridays, Saturdays, Sundays and holidays)
  • From Tuesday, August 18 to Thursday, August 27 from 20:00 each night to 5:00 the next morning (excluding Fridays, Saturdays, Sundays, and holidays)

Preliminary days August 31 (Mon)-September 10 (Thurs) Every day from 20:00 to 5am (excluding Fridays, Saturdays, Sundays, and holidays)

Schedule and calendar after change Here You can check it from.
We apologize for the inconvenience, and we appreciate your understanding and cooperation.

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 3.1MB]

June 8, 2020
East Nippon Expressway Co., Ltd.
Keihin Administration Office

NEXCO EAST At the East Japan Keihin Management Office (Yokohama, Kanagawa), E83 From Yokohama-Shindo Road (Out-bound line), at the Shin-Hodogaya Interchange (hereinafter "IC") ramp that flows into National Highway No. 16 towards the Hodogaya Bypass Hachioji, the lamp will be closed at night for bridge repair work. I will carry it out.
We apologize for the inconvenience, but we kindly ask for your understanding and cooperation so that you may have some time when you go out.

1. Closed place and date and time

(1) Closed place

A ramp that flows from the Yokohama-Shindo Road (Out-bound line) to Route 16 Hodogaya Bypass Hachioji

Closing location and date and time (1) Image of closing location

  • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.

(2) Date and time

Implementation date:

2020 July 6th (Monday)-July 21st (Tuesday) 20pm to 5am next day (Except Fridays, Saturdays, Sundays and holidays)

2020 July 27th (Monday)-August 5th (Wednesday) 20 o'clock on each day-5 o'clock the next morning (excluding Fridays, Saturdays, Sundays and holidays)

 

Preparation day:

2020 Thursday, August 6th, 8pm-5am

2020 August 18th (Tue)-September 10th (Thu) Every day from 20:00 to 5am (excluding Fridays, Saturdays, Sundays and holidays)



Image of closing location and date and time (2) date and time 1 Closing point and date and time (2) Date and time image 2
Image of QR code

*In case of stormy weather, it will be postponed to the spare day.

*Construction decision will be made on Twitter etc. around 17:00 in the evening of the day.

2. Detour

In detour, Attachment-1 [PDF: 1.28MB] Please refer to.
Detours will increase the time required, so please allow plenty of time before going out.

3. Pre-regulation due to lamp closure

Due to the construction work, the lanes and shoulders on the right side of the ramp will be restricted from 18:00 each night.
Detail is Attachment-2 [PDF: 484KB] Please refer to.

4. Construction overview

At Yokohama-Shindo Road 's new Hodogaya IC lamp, repair work will be carried out because the bridge floor slab is damaged. When carrying out the construction, it is necessary to close the lamps of the Shin-Hodogaya IC because the construction cannot be done with normal lane regulations. Therefore, in order not to inconvenience our customers as much as possible, we will close the lamps on weekdays during the night when traffic is light and carry out construction work intensively and efficiently.
The construction is necessary to use Expressway safely and comfortably. We appreciate your understanding and cooperation.

Construction overview Floor slab damage status Image of work status

5. How to get traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway
  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
* Twitter's official account "NEXCO EAST (Kanto)" (@e_nexco_kanto ) Also distributes information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.