[E14] Tateyama Expressway Kimitsu IC-Futtsu Takeoka IC 4 lanes construction progress report

-Every bridge construction has been completed-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E14] Tateyama Expressway Kimitsu IC-Futtsu Takeoka IC 4 lanes construction progress report

PDF version [PDF: 1.0MB]

2019 January 25,
East Nippon Expressway Co., Ltd.
Kisarazu Construction Office

NEXCO EAST Kisarazu Construction Office (Kisarazu City, Chiba Prefecture), E14 Tateyama Expressway (hereinafter "Tateyama Road") Kimitsu Interchange (hereinafter "IC")-Futtsu Takeoka IC We are implementing a 4-lane construction, but this time, the bridge girder construction of Aikawa Bridge has been completed. As a result, all bridge construction for the 4-lane construction section has been completed. We will continue to proceed with the construction, so we appreciate your understanding and cooperation.

We would like to inform you about the current status of the four-lane project from Kisarazu Minami Junction (“JCT”) on the Tateyama Road to Futtsu Takeoka IC.

Between Kimitsu IC and Futtsu Chuo IC, the lanes of the temporary 2 lane section (1 lane on each side) have been changed and construction is being carried out on the side of the median strip, at 2019 We are planning to start 4-lane operation. In addition, between Futtsu Chuo IC and Futtsu Takeoka IC, it was confirmed that the condition and geology of the bedrock differed from the assumption, it took time to construct structures such as bridges and retaining walls, and the start of pavement work was delayed. It was difficult to convert to four lanes this year. Going forward, we will do our utmost to make 4 lanes as soon as possible, aiming for completion within 2019.

1 Location map

Image of position map

2 Tateyama Road 4-lane construction progress

  • Tateyama Expressway Kimitsu IC-Futtsu Chuo IC [2019 March 4 lane operation start planned]
Image of the pavement situation (looking north to south) near Kimitsu City Rokute
Near Rikute, Kimitsu City Pavement situation (viewing from north to south)
Image of the pavement situation (viewing from south to north) near Sakuki, Kimitsu City
Pavement situation near Sakuki, Kimitsu City (viewing from south to north)
  • Between Michi Tateyama Futtsu center IC ~ Futtsu Takeoka IC [2019 in the 4-lane operation, target start]
Image image of Aikawa Bridge
Aikawa Bridge
Image image of Amane tunnel
Amou tunnel

(* For details on the construction status, see " Attachment-1 [PDF: 1.7MB] "reference)

Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.